皇冠体育寻求亚洲战略合作伙伴,皇冠代理招募中,皇冠平台开放会员注册、充值、提现、电脑版下载、APP下载。

首页体育正文

新2足球信用平台出租:RM1.8 billion allocated for 2022 federal road maintenance

admin2022-08-266

新2足球信用平台出租www.hg108.vip)是皇冠(正网)接入菜宝钱包的TRC20-USDT支付系统,为皇冠代理提供专业的网上运营管理系统。系统实现注册、充值、提现、客服等全自动化功能。采用的USDT匿名支付、阅后即焚的IM客服系统,让皇冠代理的运营更轻松更安全。

Works Minister Fadillah Yusof says the maintenance of federal roads is important to keep them in good condition. – The Malaysian Insight file pic, August 20, 2022.

A SUM of RM1.08 billion has been allocated for maintenance of federal roads throughout the country this year, said Works Minister Fadillah Yusof. 

He said of this amount, RM150 million is for maintenance works in the southern zone covering Pahang, Johor and Negri Sembilan. 

“Maintenance works in Pahang involve an expenditure of RM66.08 million, followed by Johor (RM60.9 million) and Negri Sembilan (RM23.63 million). 

“These maintenance works are important to keep these roads in good condition,” he told reporters in conjunction with the FTRoadpedia South 2.0 Tour in Klang today. 

Fadillah said proposals for road upgrade works on Federal Road FT050 from Ayer Hitam to Kluang in Section 33.8 until the Kluang Stadium junction in Section 49.1 would be submitted to federal authorities next year.

,

telegram采集群组www.tel8.vip)是一个Telegram群组分享平台。telegram采集群组包括telegram采集群组、telegram群组索引、Telegram群组导航、新加坡telegram群组、telegram中文群组、telegram群组(其他)、Telegram 美国 群组、telegram群组爬虫、电报群 科学上网、小飞机 怎么 加 群、tg群等内容。telegram采集群组为广大电报用户提供各种电报群组/电报频道/电报机器人导航服务。

,

Fadillah said the Phase 3B project, with an estimated value of RM385.13 million under the 12th Malaysia Plan, is aimed at reducing fatal accidents throughout the alignment. 

He said it is a continuation of the Phase 3A project worth RM219 million, which is under construction and expected to be completed in October 2024. 

“This location has recorded the most accidents in Malaysia due to the absence of road shoulders, medians and U-turns, with 52 accidents reported from 2020 to June 2022. 

“This road is the main toll-free route connecting Batu Pahat, Kluang and Mersing districts, and it will involve construction work on road shoulders, medians, U-turns and related works,” he added.

He also said an additional allocation of RM600,000 has been approved to upgrade streetlights along Federal Road FT050 to improve various aspects of road travel, especially towards the safety of road users. – Bernama, August 20, 2022.


转载说明:本文转载自Sunbet。

网友评论